Industrial Alloy Steel Boiler Stack Economizer Low Pressure

Suzhou orl power engineering co ., ltd
Contact Now

Industrial Alloy Steel Boiler Stack Economizer Low Pressure

Brand Name : ORL Power

Model Number : Customization

Certification : ISO9001/SGS/TUV/ASME/EN

Place of Origin : Zhangjiagang,Jiangsu,China

MOQ : 1 Set/Sets 10tons

Price : Contact me | Get Latest Price

Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram

Supply Ability : 500Ton/Tons per Month

Delivery Time : 50~100 Days

Packaging Details : Iron Frame Package

name : Boiler Stack Economizer

Structure : Fire/Water Tube

Fuel : Hot Water/Steam

Pressure : High/Low Pressure

Style : CFB Boiler

Dimension(L*W*H) : Customization

Weight : 10~1000ton

Keywords : Boiler Economizer

Product name : Paper Plant Used Economizer For Boiler Spares

Contact Now

Industrial Steam Boiler Spare Parts Serpentine Coil Bending Stack Economizer

The function of the economizer is as its name implies, to “economize” or save on cooling costs. Obviously, it costs money to operate the compressor. If the compressor can be shut down and the system still provide adequate cooling, energy savings can be realized.

Description Boiler economizer
Material Alloy steel, Carbon steel, SA210C ,SA213T22, etc.
Material standard ASTM, EN or ISO etc.
Dimension Customization
Weight

Min: 10 ton

Max.:1000 ton

Smelting Process: EF+LF + VD
Process Material→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →rough machining→UT →2nd Heat treatment →finishing machining →Inspection
UT standard ASTM A388 or EN10228, etc

Industrial Alloy Steel Boiler Stack Economizer Low Pressure

2.Technical Parameter:

Model Name Specification Quantity Working Pressure

Single Row Water Pressure Test

MPa

Integral Test Pressure

MPa

35T/h CFB/CFBB/CFBC Boiler Bare Tube Economizer

32*3;

20-GB3087

124 Rows

(Including high temperature, medium temperature and low low temperature three sections)

4.54MPa 9.1MPa 5.25MPa
35T/h CFB/CFBB/CFBC Boiler Spiral Fin Tube Economizer

32*3;

20-GB3087

50 Rows (Including high temperature and low temperature sections) 4.54MPa 9.1MPa 5.25MPa
35T/h Chain Grate Boiler Spiral Fin Tube Economizer

38*3;

20-GB3087

46 Rows Rows (Including high temperature and low temperature) 4.54MPa 9.1MPa 5.25MPa
35T/h Chain Grate Boiler Bare Tube Economizer

38*3;

20-GB3087

99 Rows (Including high temperature, medium temperature and low low temperature three sections) 4.54MPa 9.1MPa 5.25MPa
35T/h Chain Grate Boiler Bare Tube Economizer

32*3;

20-GB3088

99Rows (Including high temperature, medium temperature and low low temperature three sections) 4.54MPa 9.1MPa 5.25MPa
35T/h CFB/CFBB/CFBC Boiler Bare Tube Economizer

32*3;

20-GB3087

93 Rows (Including high temperature, medium temperature and low low temperature three sections) 4.73MPa 9.5MPa 5.93MPa
35T/h CFB/CFBB/CFBC Boiler Bare Tube Economizer

32*3;

20-GB3087

108 Rows (Including high temperature, medium temperature and low low temperature three sections) 4.73MPa 9.5MPa 5.93MPa
48T/h CFB/CFBB/CFBC Boiler Spiral Fin Tube Economizer

38*4;

20G-GB5310

45 Rows 10.92MPa 21.84MPa 12.64MPa
75T/h CFB/CFBB/CFBC Boiler Bare Tube Economizer

32*3.5;

20G-GB5310

156 Rows (Including high temperature, medium temperature and low low temperature three sections) 6.28MPa 12.56MPa 7.27MPa
75T/h CFB/CFBB/CFBC Boiler Bare Tube Economizer

32*3.5;

20G-GB5310

114 Rows (Including high temperature, medium temperature and low low temperature three sections) 4.7MPa 9.1MPa 5.25MPa
75T/h CFB/CFBB/CFBC Boiler Spiral Fin Tube Economizer

32*3;

20-GB3087

72 Rows (Including high temperature, medium temperature and low low temperature three sections) 4.54MPa 9.1MPa 5.25MPa
75T/h CFB/CFBB/CFBC Boiler Spiral Fin Tube Economizer

32*3;

20G-GB5310

72 Rows (Including high temperature and low temperature sections) 6.28MPa 12.56MPa 7.27MPa
75T/h CFB/CFBB/CFBC Boiler Bare Tube Economizer

32*4;

20G-GB5310

114 Rows (Including high temperature, medium temperature and low low temperature three sections) 6.28MPa 12.56MPa 7.27MPa
Materials Carbon Steel Or Alloy Steel
Type bare tube economizer;finned tube economizer; spiral finned tube economizer;cast iron economizer for power plant/station boiler and industrial/commercial boilers;
Brand Jinan Yuanda
Application Boiler heat exchanger parts for Coal Fired Steam Boiler/Coal Fired Hot Water Boiler/CFBB bed boiler
Remarks Customized order is also accepted.

3.Advantages:
3.1. Excellent anti-wear performance
3.2. Compact structure
3.3. High thermal efficiency
3.4. Stability

Contact Us

ADD: 11 East Renmin Road, Zhangjiagang City, Jiangsu, China

Phone:+86 0512-56770166

E-mail: orl@orlpower.com

Website: http://www.boiler-units.com


Product Tags:

Industrial Boiler Stack Economizer

      

Hot Water Boiler Stack Economizer

      

Low Pressure Boiler Economizer

      
Best Industrial Alloy Steel Boiler Stack Economizer Low Pressure wholesale

Industrial Alloy Steel Boiler Stack Economizer Low Pressure Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Suzhou orl power engineering co ., ltd
*Subject:
*Message:
Characters Remaining: (0/3000)